Category: Case studies

Interflon’s Clean OTR

“The train is on time as there are NO leaves on the track”

“Surely not..?”

“Yes, really!”

We’ve all felt the frustration of a train delay, often in autumn when millions of leaves fall from trees onto the tracks, but why is this such a big issue, and what can be done about it?

Read More

WTA Energy – Tier 1 Infrastructure Storage and Logistics Solution

Rail Cluster member WTA Energy recently delivered work for a Tier 1 infrastructure project that required a secure, high-capacity storage solution for high-value equipment and products, ensuring safe handling, optimised logistics, and long-term risk mitigation. The facility was designed to accommodate large-scale deliveries, implement structured storage methodologies, and streamline transport coordination for critical installations.

Read More